伊人大综合,日本18hd,东京热加勒比无码少妇,www.cao

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1198

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://www.cyuy.cn//


亚洲网暴操逼视频| 少妇系列之白嫩人妻| 亚洲第一成人网站| 山西一粮库员工称遭欠薪| 欧美淫荡少妇视频| 一区二区无码专区| 国产精品无码AV| 欧美成人观看7777| 免费看成人黄色视频| 午夜精品久久久久久99热| 亚洲人成无码网站久久| 亚洲一区二区综合| 欧美日韩性爱网| 成人无码国产精品nuzz| 久久99精品成人片试看| 性欧美久久久久久久| 亚洲熟妇熟女色色| 国产口交丝袜| 无码人妻aⅴ一区二区三区视频| 亚洲精品gv天堂无码男同| 六月婷亚洲男人的天堂| 午夜福利09不卡片在线机视频| 女人啪啪啪免费视频| 精彩内射黑屄P18| 午夜欧美性爱| 九九久久成人免费电影| 国产精品无码素人福利不卡| 夜夜爽videos| WWW视频免费在线观看| 天堂资源在线www中文| 亚洲国内精品| china内射骚妇| 在线无码免费| 少妇高潮喷白浆精品一区二区| 337P人体粉嫩| 男人天堂黄色网| 亚洲无码少妇| 奇米影视图片777| 久久九九有精品国产| 国产69囗曝吞精在线视频| 亚洲五月天激情网|